Many of the inquiries we receive about solar repowering begin with a customer noticing a difference between their electricity bill and the data from their monitoring app.

The system is ten or fifteen years old, nothing seems broken, and production is simply declining.

Often, the underlying question is whether it makes sense to keep the system. Many homeowners assume their panels are worn out, but in most cases, this is not accurate.

Below, I will outline the reasons for this, review the relevant regulations for 2026, and explain when repowering is a practical and cost-effective choice.

Quick Answer

Solar repowering involves replacing the aging components of an existing system, usually the solar modules and inverters, while reusing the existing structure, wiring, and interconnection.

It allows for the recovery of lost energy production, reduces rising maintenance costs, and extends the lifespan of a photovoltaic system without the need to build a new installation.

Why Solar Repowering Is Now a Real Question in Our Market

My background in the financial sector shapes my approach to solar repowering. When a homeowner contacts me about an underperforming system, my focus is not immediately on the panels.

I think more about the system’s output, its operating costs, and its remaining lifespan. These are three distinct issues that homeowners tend to confuse.

We launched TerraSol in 2009, which explains why this topic comes up regularly on my desk. The systems we, like all other players in the region, installed in the early years are now between 15 and 17 years old.

Solar Repowering in PAThe solar industry has focused on new installations for many years, and is now entering a phase where ongoing maintenance becomes just as important. Many homeowners, and even some installers, are still adjusting to this shift.

There’s a more important point that the renewable energy sector has been slow to address. For twenty years, the energy transition has been measured by new solar projects and added capacity.

Keeping existing solar assets producing is the same work toward the same broader goals, on land and permits and electrical infrastructure that are already there

Maintaining the output of existing solar assets is the same work, pursuing the same general objectives: on the ground, with the necessary permits, and thanks to the existing electrical infrastructure.

A modernized installation replaces the same amount of fossil-fuel energy as a new one would. It’s just that this doesn’t appear in the installation statistics, so nobody talks about it.

The calls follow a recurring pattern: decreased production, a malfunctioning monitoring system, the company that supplied the system has disappeared, or an inverter failure for which a replacement part is no longer available.

Almost none of this is a problem with the panels themselves. Almost always, the issue lies with the inverters and control systems.

SHOWCASE

Explore our commercial
solar installation projects

See how we can reduce
your energy costs

We have designed and installed solar systems for a range of auto dealerships. Discover how we can help you save.

Additional Information

The Panels Are Usually Fine. The Rest Is Not.

Solar panels degrade slowly, more slowly than most people realize. The most commonly cited reference study is Jordan and Kurtz’s “Photovoltaic Degradation Rates: An Analytical Review,” by researchers at NREL, published in the journal Progress in Photovoltaics (Wiley) in 2013.

These researchers compiled nearly 2,000 degradation measurements from four decades of field testing and found a median rate of approximately 0.5% per year. A 2012 installation therefore still produces about 93% of its initial output, which makes replacement unnecessary on those grounds alone.

Inverters present a completely different problem. String inverters from the early 2010s had ten- to twelve-year warranties, and those warranties have now expired.

Spare parts are unavailable because the supply chains for older photovoltaic components do not survive a manufacturer’s departure, and many manufacturers from that era have disappeared.

Solar Repowering in PA Let me give you a concrete example, since it’s one of our own projects. In July 2016, we completed the installation of a 313 kW SunPower Helix Roof system for American Reading Company in King of Prussia, projected at approximately $2 million in electricity cost savings over 25 years.

This was the first Helix Roof system installed by a SunPower commercial dealer partner. It is a good system and it is still operating. SunPower filed for Chapter 11 bankruptcy in August 2024, its assets were acquired by Complete Solaria, and that company adopted the SunPower name in April 2025.

The brand still exists, but under new ownership.

If you own SunPower equipment, there’s no need to panic, but it’s important to verify in writing who now holds your warranty, because it is not the same company you originally signed the contract with.

This is a recurring problem with older inverters. When a manufacturer goes out of business, the supply chain for its solar equipment disappears with it, and the older components become unusable regardless of their condition.

That’s why I distinguish between the two. Declining performance due to module degradation is normal and gradual, and it doesn’t warrant immediate attention.

Declining performance due to aging equipment, electronic failures, and expired warranties is what makes repowering projects worthwhile.

The equipment market has also evolved, and that’s where modern inverters prove their worth. As an Enphase Gold Installer, most of what we install now is panel-level.

Enphase IQ8 Series microinverters come with a 25-year limited warranty in the U.S., and the Enphase IQ Battery 5P storage system is covered for up to 15 years.

Compare that to a string inverter carrying a twelve-year warranty and no monitoring, and the need to replace outdated equipment becomes clear.

Not sure who holds the warranty on your equipment anymore? Send us the make and model, and we’ll tell you where it stands. No obligation, and no quote attached.

The repowering process allows you to reuse the costly and time-consuming elements of a project: the support structure, conduits, electrical infrastructure, and interconnection.

All of this is already permitted, installed, and inspected. Replacing solar modules and inverters on the same footprint is a much simpler operation than a new installation, and the cost difference is primarily due to the labor and permits you don’t have to obtain again.

You benefit in two ways.

First, higher efficiency. New modules produce more power per square foot than older technologies, so on the same roof or field you can install a larger photovoltaic system without increasing the footprint.

Second, improved visibility. The advanced technology in current equipment lies in the electronics, not the panels. New inverters incorporate monitoring that alerts you in case of a failure, and new components take readings at the panel level rather than at the string level.

Most of the underperformance I observe in ten year old installations went unnoticed for years due to a lack of detection methods.

What engineers check first

pv plant solar systemNew panels cannot be installed in existing structures as a like-for-like swap. The new modules have different dimensions and electrical characteristics, including voltage and current ranges that the original strings were never designed for.

This determines whether the rails, fixings, and wiring can be reused, or whether the entire reuse case falls apart. This step is crucial to the profitability of a retrofit and occurs before a quote is ever drawn up.

In European technical documentation, the same work is referred to as PV revamping.

Battery storage is another important point. If the electrical infrastructure is already open and the inverters are being replaced anyway, adding a storage system now is less expensive than doing it as a separate project three years from now.

This isn’t relevant for every site. It is simply more economical to make the decision while the work is underway.

We built a solar microgrid with storage for Sycamore International in Chester County using an ESS iron-flow energy storage system, and the success of that project came from integrating storage at the design stage rather than adding it later.

At the utility scale

For large PV projects and solar farms, the reasoning remains the same, but with more zeros. Asset owners at this scale analyze it as a risk assessment: energy yield against rising maintenance costs, with careful verification of whether key components can still be sourced.

Replacing the inverter on its own, without touching the modules, is often the first step in a photovoltaic power plant. Project owners at this scale also weigh production tax credits against the investment tax credit, a calculation different from the one a building owner performs.

The term originated in the wind energy sector. Operators found that replacing 1990s-era machines with fewer turbines allowed them to produce more power on the same land area, and the solar industry adopted the term.

Owners of wind farms and solar power plants arrive at the same conclusion from different directions: the site is the asset, and the equipment on it is replaceable.

I’d rather lose a sale than let a client base their budget on a tax credit that no longer exists, so here is the current situation.

For homeowners, the federal residential credit is gone

Under Public Law 119-21, the Residential Clean Energy Credit (Section 25D) is no longer applicable to expenditures made after December 31, 2025.

The IRS has also clarified that the expenditure is considered made on the date the original installation was completed, not the date of payment.

A residential repower completed in 2026 does not qualify for any federal tax credit. Anyone telling a homeowner otherwise right now is either behind the times or trying to sell.

The remaining state and utility incentives are still significant. In our region, this includes the PECO solar rebate, now extended through 2031.

That program is written for new residential installations, so if you are repowering rather than installing for the first time, check your eligibility with PECO before factoring it into your budget.

Net metering and the Alternative Energy Credits your installation generates for each megawatt hour are still in effect, and we went through the current math in is solar still worth it in PA without the tax credit.

For commercial and nonprofit owners, Section 48E is still live but on a clock

solar company in paProjects whose construction began on or before July 4, 2026 are subject to the previous continuity rules, while projects starting after that date must be placed in service by December 31, 2027. That is tighter than it seems once you factor in permitting and equipment lead times.

The tax credit is also only half the picture on a commercial project, because accelerated depreciation contributes significantly to the return and applies to the new equipment in a repower just as it does to commercial solar in Pennsylvania generally.

Municipal owners and nonprofit organizations are in a different situation, which we discussed in our article on solar for municipalities.

A significant portion of our commercial portfolio falls into that category, including Williamson College of the Trades, Millersville University, and the University of Delaware, and those owners have different levers than a car dealership does.

The 80/20 rule is the one worth knowing

Under the final Section 48 regulations, retrofitted energy property can be treated as originally placed in service, which restores eligibility for the tax credit, provided that the fair market value of the used components does not exceed 20% of the total value of the energy property.

Reusing support structures and foundations while replacing modules and inverters generally falls within this limit.

This provision is what makes commercial repowering economically viable, and it applies to each individual unit of energy property within a project rather than to the project as a whole.

Interconnection remains subject to limitations

In Pennsylvania, 52 Pa. Code § 75.13 limits the nameplate capacity of residential customer generators to 50 kW and nonresidential generators to 3 MW, with up to 5 MW under the conditions outlined in § 75.16. If a repower increases your system’s capacity, your utility must review it.

Before ordering any equipment, obtain written confirmation of how your existing interconnection agreement will be treated, because this is where regulatory hurdles turn into scheduling problems and it is the most easily avoided delay in the entire project.

A repower also requires the necessary permits from the local authority having jurisdiction, and regulatory compliance for a modified system is not automatically inherited from the original approval.

Assume you are filing, not amending. Owners of multiple meters and properties should verify the impact of a capacity change on their virtual net metering rules, as the allocation on file was calculated based on the size of the old system.

First and foremost, I need to know whether you own the system or someone else does. Many installations from 2010 to 2015 were done under leases and power purchase agreements, and the person currently occupying the property is usually not the one who can authorize replacing it.

If the system is leased, it belongs to the finance company; you cannot repower it, and in most cases you can’t even touch the equipment without their consent.

In practical terms, you are looking at either buying the system out and then repowering it, or waiting until the end of the term.

I’ve written about solar ownership versus leasing and buying out a solar lease elsewhere, and both apply directly here. This is the question that most often surprises people, so I ask it first.

Not sure whether you own your system outright? We can read your agreement and tell you what it allows before you spend time planning a repower. Call us at (888) 873-9995!

I want to see at least three of the following conditions before I bring up repowering:

  1. The system is twelve years or older.

  2. The inverters are no longer under warranty or are no longer manufactured.

  3. Measured energy production is more than 15% below projected performance.

  4. The roof requires work within five years.

  5. The building’s electrical load has increased, typically due to an electric vehicle or a heat pump.

  6. The mounting structure and fasteners are in good condition and reusable.

Number six is the one that decides profitability. If the existing infrastructure cannot be reused, this is no longer a repower but a new installation, and every number changes.

The discipline is the same as it is for a first system: you price the true cost against the return rather than buying on panel efficiency alone.

If a system is less than eight years old and the electronics are functional and under warranty, I say so, and we proceed with a repair. Often the solution is routine solar panel maintenance and a monitoring upgrade rather than new hardware, which is enough to improve efficiency without replacing anything.

I’ve talked clients out of repowering more than once, and I intend to keep doing it. A production audit costs almost nothing and gives an honest answer, which is more than you can say for a free quote.

process for power repoweringOwners often ask this, and it’s a fair question. Modules coming off a repowering job should go to a certified recycler.

Solar panels are primarily glass, aluminum, and silicon; the recycling infrastructure has improved considerably, and sending fifteen-year-old modules to landfill undermines the very purpose of the work.

For us, the circular economy aspect isn’t a marketing line. It is part of the scope, and we put it in writing.

End-of-life management is the other point that either validates or undercuts the renewable energy argument. If replacing older technology with new technology just means the old panels become waste, then the improved efficiency on the roof is only part of the accounting.

Recovering the materials from the old PV components is the rest.

Talk to Us Before You Assume the Worst

TerraSol Energies has been designing and managing solar installations for homeowners, businesses, and nonprofits across Pennsylvania, Delaware, New Jersey, and Maryland since 2009, from our Chadds Ford office. I have watched a lot of these systems age, including our own early work.

If your array is a decade old and you are not sure what you are looking at, start with a production audit rather than a quote. We will tell you whether the answer is a repair or nothing.

Call us at (888) 873-9995 or request a custom solar proposal, and we will look at whether solar repowering is the right call for your system.

Enphase - Assets_Platinum_linear_edit
Trusted solar services:
TerraSol is a top-ranked solar company in the tri-state area.

Frequently Asked Questions

What is solar repowering?

Solar repowering replaces the major components of an existing system, usually the solar modules and inverters, while reusing the racking, wiring, and interconnection already installed. It restores energy production and extends operational life without a new installation.

NREL’s review of nearly 2,000 field measurements found a median degradation rate of about 0.5% per year, so a panel typically produces about 85% to 90% of its original output after 25 years. Inverters fail long before modules do.

Usually, because the racking, conduit, electrical infrastructure, and interconnection are reused. How much cheaper depends on how much of the existing infrastructure is still sound.

No. Section 25D does not allow expenditures made after December 31, 2025, and the IRS treats such expenditures as made when installation is completed. Commercial and nonprofit owners may still use Section 48E, subject to its December 31, 2027 placed-in-service deadline.

It can if nameplate capacity increases. Pennsylvania caps residential customer generators at 50 kW and nonresidential at 3 MW under 52 Pa. Code § 75.13. Confirm in writing the treatment of your existing agreement with your utility before work starts.