Engineering Solar Systems - What Happens Before Installation

Most people shopping for solar compare panel brands and price per watt, and almost nobody asks about engineering solar systems, which is the work that actually determines what they get.

I’m Robert Santoleri, president of TerraSol Energies in Chadds Ford, Pennsylvania. My family founded this company in 2009, and since then, we’ve been designing and installing systems in Pennsylvania, Delaware, New Jersey, and Maryland.

In my experience reviewing many proposals, the key difference between a successful installation and one that falls short is almost always in the system design, not the hardware.

So, in a nutshell, here’s what happens between signing the contract and commissioning the system.

Quick Answer

Solar system design encompasses all preparatory work: site surveys, structural load calculations, electrical design, and permit and grid-connection documentation. It determines the compatibility of the components, the capacity of your electrical panel, and the system’s output.

engineering solar systemsWhat Exactly Does Engineering Solar Systems Involve?

Solar energy system development begins here, before any hardware is ordered.

Four elements are designed before any installation:

  • Structure: Can the roof support the weight of the solar panels in windy and snowy conditions throughout the system’s lifespan?

  • Electrical: Wiring the modules, selecting the inverter, and connecting to the electrical grid.

  • Output: The amount of energy produced by the system on your roof, depending on shading and climate.

  • Permits: Submitting the plan to the municipality and requesting a connection from the electricity provider.

One oversight, and you’ll discover it later, usually during the inspection.

First step: Technical site audit

We always conduct an on-site visit before creating your solar plan. This step is essential to ensure accuracy and quality in your system design.

We gather structural and electrical information: roof pitch and azimuth, rafter dimensions and spacing, decking condition, roof age, location of ventilation ducts and chimney, electrical panel power rating, and shaded area in December (not June). Winter shading is often underestimated.

For example, a tree that provides shade in July may impact your solar production in January, when energy needs are often highest.

We also ask for your electricity bills for the past twelve months. Your kWh consumption history is the most useful document you can provide to a solar panel designer.

We perform detailed engineering calculations for both new and existing structures.

The Pennsylvania Uniform Building Code (UCC) transitioned to the International Code Council (ICC) 2021 series, effective January 1, 2026, replacing the 2018 series, which had been in effect since 2022.

IBC 2021 references ASCE 7-16 for structural loads. This standard is particularly important for solar energy because it has increased the wind pressure coefficients for the components and cladding used to calculate the uplift resistance of rooftop photovoltaic panels.

In short: wind resistance requirements for rooftop photovoltaic panels are now more stringent. A configuration that met the requirements ten years ago may no longer meet them today.

solar technologyStructural work includes:

  • The self-weight of the modules, rails, and fasteners on the frame

  • Consideration of wind loads by roof zone, as edges and corners are subject to greater pressure than the center

  • The snow load adapted to your local climate, as well as the influence of panel drift and slippage on the structure

  • The number of fasteners, their spacing, and the rafters on which they rest

The Pennsylvania Uniform Building Code (UCC) requires construction documents with the permit application. In accordance with state law, these documents must be prepared by a licensed architect or engineer.

Since requirements for structural review can vary by municipality, we coordinate with your local planning department to ensure your application meets all necessary standards.

This is often where quotes from other companies diverge, and it’s important to understand this point.

Your electrical panel sets a limit.

According to NEC 705.12, 125% of the solar output current plus the main circuit breaker rating generally cannot exceed 120% of the busbar rating.

Connecting it to a standard 200A electrical panel with a 200A main supply: (1.25 x 32A) + 200A = 240A, which is exactly 120% of 200A. Therefore, the inverter’s output power is limited to 32A, which corresponds to approximately 7.7kW AC at 240 volts. The solar circuit breaker must be installed at the opposite end of the busbar from the main supply, with a label indicating that it must not be moved.

If you want to install a larger solar power system on this panel, you will need to consider reducing the main breaker rating, connecting it to the feeder side, or upgrading the electrical installation.

This is a design choice that must be included in the initial quote, not added as an addendum after the technicians have arrived.

solar installation for residential and commercial buildingsA quick-stop device is required.

The NEC 690.12 standard requires that photovoltaic circuits installed on or in buildings be equipped with a quick-stop device to reduce the risk of electric shock for firefighters. The Pennsylvania Uniform Construction Code (UCC) now references the 2020 National Electrical Code.

In practice, this drives the electronics at the module level, which is one of the reasons for our Enphase Gold Installer certification.

String and Inverter Sizing

Modules are grouped to ensure the voltage remains within the inverter’s operating range, regardless of extreme temperatures. The conductors are sized with the appropriate reduction factors.

Low-voltage cables for monitoring and communication interfaces are planned, not improvised. The DC/AC ratio is carefully chosen.

There’s often a temptation to cover the entire roof. I disagree.

In Pennsylvania, the rated power of a residential system with net metering is limited to 50 kW (Pennsylvania Code Section 75.13, Title 52). This is far more than a home needs. The real limits are your annual energy consumption, the usable area of your roof, and your electrical panel. Sizing also determines your grid connection, which affects the installation schedule.
Review LevelApplies toSource
Level 1Inverter systems of 10 kW or lessPennsylvania Code, Section 75.34 (52 Pa. Code)
Level 2Certified inverter equipment of 2 MW or lessPennsylvania Code, Section 75.34 (52 Pa. Code)
Level 3Equipment of 2 MW or less that does not meet the criteria for Levels 1 and 2Pennsylvania Code, Section 75.34 (52 Pa. Code)
Level 4Non-exporting systemsPennsylvania Code, Section 75.34 (52 Pa. Code)
Most homes are classified as Level 1. In accordance with Section 75.37 of the Pennsylvania Code (52 Pa. Code), the energy provider has 10 business days to notify you of the completion of your file. Your file will then be reviewed, followed by 15 working days to verify the security of the connection. A test in the presence of a witness is possible within 10 working days of the certificate of conformity being issued.

The final package includes a site plan, a roof plan, a mounting detail, structural calculations, a single-line diagram, equipment datasheets, and a labeling plan.

This package must be submitted to two separate agencies, according to two different deadlines: your municipality for building and electrical permits, and your energy provider for grid connection approval. The system can only be legally commissioned after obtaining the operating permit.

As a PECO Certified Partner, we handle both of these steps. We also take care of the application for the $500 PECO Residential Solar Panel Installation Grant, extended until 2031.

An important point to remember for 2026: the Residential Clean Energy Tax Credit (Section 25D) is no longer applicable to installations commissioned after December 31, 2025, according to the IRS. If a residential quote still shows a 30% federal tax credit, ask about it.

Commercial solar systems are subject to different regulations, which we detail in our guide to commercial solar energy for businesses in Pennsylvania.

SHOWCASE

Explore our commercial
solar installation projects

See how we can reduce
your energy costs

We have designed and installed solar systems for a range of auto dealerships. Discover how we can help you save.

Additional Information

A Project That Illustrates The Critical Importance of Engineering

Commercial solar power systems show this most clearly.

The most striking example is Phoenix Contact in Middletown, Pennsylvania. This German electronics manufacturer set a goal for its U.S. headquarters to achieve carbon neutrality for a new 6,500-square-meter warehouse.

The completed 1 MW system consists of 2,185 solar panels and produces 1,241,235 kWh per year. This production covers 100% of the building’s energy needs, offsets approximately 885,000 kg of CO₂ per year, equivalent to the annual consumption of 160 households.

The building has achieved Net Zero certification and LEED Silver certification.

engineering site auditsLet’s look at the timeline. Planning began in 2017. Design and engineering took place from 2017 to 2020. Construction didn’t start until May 2021, and the project was completed in the spring of 2022. Years of design, then construction.

The engineering team had to solve problems unrelated to the choice of panels. The system had to be coordinated with an existing natural gas combined heat and power (CHP) plant on the site so that the two energy sources could operate in tandem.

The monitoring and management components from Phoenix Contact had to be integrated into the system, posing challenges for both communication interfaces and electrical systems.

Furthermore, as this was a new build, the electrical and structural design had to be finalized while the building was still in the planning stage.

We took the same approach at Woodcrest Station Business Park in Lawnside, New Jersey, where we began discussions with the developer two years before construction started.

Building 1 is equipped with 1,416 panels and produces 849,041 kWh per year, covering approximately 80% of its energy needs and reducing carbon emissions by 405 tons annually.

By integrating solar energy into the electrical and structural plans from the beginning, we avoided unnecessary changes and kept the project on schedule.

Whether your project is large or small, the process remains the same: we focus on design first, then move to installation.

Read the full article: New Jersey Building Design Case Study. For a residential example, see our Montgomery County, PA case study.

If you’re considering a career as a solar energy engineer rather than building a house with solar panels, you should know that this profession has an official definition. Solar engineering is one branch of renewable energy engineering, and the solar industry now draws people from many technical backgrounds.

O*NET describes solar energy systems engineers as performing “site-specific engineering analysis or evaluation of energy efficiency and solar projects involving residential, commercial, or industrial customers.”

The tasks listed correspond to those performed on our projects:

  • conducting technical site audits to gather structural and electrical information necessary for the design of solar energy systems;

  • creating electrical schematics and connection specifications using computer-aided design (CAD) software;

  • designing photovoltaic systems by applying knowledge of structural energy requirements and thermodynamics; and

  • using simulation software to test system performance.

pa solar design engineerRegarding education, 56% of O*NET respondents indicated that a bachelor’s degree is required, while 11% mentioned a post-secondary certificate or a two-year post-secondary diploma.

According to O*NET’s forecasts, employment in this sector is expected to grow by 1 to 2% between 2024 and 2034, with approximately 9,300 positions to be filled during this period.

The required degrees vary. Electrical engineering covers conductors, inverters, and power systems. Mechanical engineering and materials science deal with assembly, thermal expansion, and corrosion. Civil and structural engineers focus on load paths.

In the field of solar power plants, a project engineer coordinates the design of the entire system. A power systems engineer handles the grid interconnection studies on those projects. Many engineers in the solar sector come from other fields, like Carl.

Two different technologies are classified as solar. Photovoltaics convert sunlight into electricity. Solar thermal systems capture heat and power water or space heating systems, replacing the electrical panel. These systems require different equipment, engineering, and permits.

We design and install photovoltaic systems for residential and commercial buildings. If you receive a quote that doesn’t specify which system it includes, it’s wise to ask.

After fifteen years in the industry, three key lessons stand out.

Solar panels have become commodity products. The engineering, on the other hand, is far more complex.

cost for a custom solar installationModule efficiency, even among reputable manufacturers, is so close that it rarely influences the final result. It’s the design that makes all the difference.

In my experience, challenges in solar projects almost always result from issues in the system design.

Problems such as non-compliant inspections, incomplete maintenance, or undersized panels are often not apparent at installation, but can be avoided with careful design.

It is important to know who performed the engineering for your system and to review the design documents.

You are entitled to receive the single-line diagram, structural calculations, and production model for your system. We always provide these documents to our customers for your peace of mind.

While price is often the focus in solar energy, the architecture, components, and system design are what ensure reliable performance for years to come.

Contact Us

If you would like a technical solution tailored to your roof, we will come to your location to conduct an audit. You will receive the figures and plans, and you can then make your decision.

Call (888) 873-9995 or request a site visit. You will also be able to see our completed projects and meet the family who runs the company.

Fifteen years after our beginnings, I remain convinced that the design of solar systems is the only aspect of this industry worth discussing.

Enphase - Assets_Platinum_linear_edit
Trusted solar services:
TerraSol is a top-ranked solar company in the tri-state area.

Frequently Asked Questions

How long does the engineering take?

Design and the plan set take days. Permitting and utility review take weeks. Under 52 Pa. Code § 75.37, a Level 1 interconnection review alone gives the utility 10 business days to confirm that the application is complete and 15 more business days to verify safe interconnection.

Pennsylvania’s UCC requires construction documents to accompany the permit application, and under state licensing law, those documents are prepared by a licensed architect or professional engineer. What each township requires for stamped structural review varies, so we confirm before filing.

Your panel and your usage usually stop you first. Under NEC 705.12, the busbar rule caps a standard 200-amp panel with a 200-amp main at about 32 amps of inverter output without a service change.

As of January 1, 2026, the Pennsylvania UCC adopts the 2021 ICC code series and the 2020 National Electrical Code. Structural loads follow ASCE 7-16 as referenced by the 2021 IBC.

No. The IRS states the Residential Clean Energy Credit is not available for property placed in service after December 31, 2025. Pennsylvania net metering, SRECs, and the PECO rebate still apply.